Cost Estimator
Build a Detailed Unit Price Analysis (DUPA) the way PH contractors and DPWH do it. Enter your materials, labor crew and output rate, and equipment, add OCM / Profit / VAT mark-ups, and the app gives you the direct cost, the total cost, and the unit price for the pay item โ with a full worked breakdown you can export to PDF.
โญ Free to use ยท Balance โฆ EP
โ Pay item
Whole scope of this pay item, in the output unit above.
โก Materials (for the whole quantity)
Material
Qty
Unit
Unit price โฑ
Materials: โฑ0.00
โข Labor
How much output the crew below finishes in one day, in the output unit
(e.g.
8 mยณ/day). Duration = total quantity รท output per day.Crew (one day's crew)
Designation
No.
Daily wage โฑ
Crew / day: โฑ0.00
โฃ Equipment (optional)
Equipment
No.
Rate โฑ/day
Equipment / day: โฑ0.00
โค Mark-ups
OCM + Profit are applied on the direct cost; VAT is then applied
on top of (direct + OCM + profit). Uncheck a box to leave that mark-up out.
โถ ๐ Indicative PH unit-price starter list
Edit any price below to your local quote โ values are yours to copy into the rows above.
| Item | Unit | Indicative โฑ |
|---|
๐ต Unit price analysis
โ
Unit price
Cost summary
DUPA breakdown
โ ๏ธ This is an estimating aid, not a bid. The unit price depends on
your actual supplier prices, crew productivity, equipment rentals, hauling,
taxes and site conditions. Treat the indicative rates as starting points,
replace them with real quotations, and reconcile against the latest DPWH
DUPA and your project's bill of quantities before submitting.