๐งฐ PM Tool Bundle
Four construction-management calculators in one โ a Gantt + CPM schedule analyzer, a Resource Leveling histogram & smoother, an Equipment Productivity estimator, and a Crew Balance tool. Build it, see the chart, download the report.
๐ Activities
Enter each activity, its duration (days), and its predecessor IDs (comma-separated; blank = starts at the beginning).
| ID | Name | Duration | Predecessors |
|---|
Schedule results
Gantt chart (early-start)
โ๏ธ Resource demand by activity
Enter each activity's early-start day (start of project = day 0 or 1, your choice), duration (days), resource units needed per day (e.g. workers), and total float (days it can slide; 0 = critical).
| Activity | Start day | Duration | Res./day | Float |
|---|
Resource histogram
Before leveling (early-start)
After greedy leveling (within float)
Production of one excavator / loader / scraper from its cycle.
Match trucks to a loader and find the fleet production & match factor.
Productivity
Duration, man-days and unit labor cost from a crew's daily output.
| Role | No. | Wage/day โฑ |
|---|
Enter each crew member's working time per cycle (min). The cycle is paced by the busiest member; idle time and balance efficiency follow.
| Member / station | Work time/cycle (min) |
|---|
Crew results
Sign in to Ebora
This tool is free. Sign in to see your Ebora Points balance and top up.
Top up Ebora Points
1 EP = โฑ1 ยท Minimum top-up 50 EP ยท Pay via GCash / Maya / Bank QRPh