Four construction-management calculators in one โ€” a Gantt + CPM schedule analyzer, a Resource Leveling histogram & smoother, an Equipment Productivity estimator, and a Crew Balance tool. Build it, see the chart, download the report.

๐Ÿ†“ Free to use. Sign in to save your Ebora Points balance & export PDF reports.

๐Ÿ“… Activities

Enter each activity, its duration (days), and its predecessor IDs (comma-separated; blank = starts at the beginning).

IDNameDurationPredecessors

Schedule results

Critical (TF = 0) Float

Gantt chart (early-start)

โš–๏ธ Resource demand by activity

Enter each activity's early-start day (start of project = day 0 or 1, your choice), duration (days), resource units needed per day (e.g. workers), and total float (days it can slide; 0 = critical).

ActivityStart dayDurationRes./dayFloat

Resource histogram

Before leveling (early-start)

After greedy leveling (within float)

Leveling here is a greedy series-method heuristic (it slides each floatable activity within its float to flatten the peak); it does not guarantee the mathematical optimum. Use it to understand the idea, then check against your course method.

Production of one excavator / loader / scraper from its cycle.

Match trucks to a loader and find the fleet production & match factor.

Productivity

Capacities, fill factors, cycle times and efficiencies are indicative โ€” confirm against the actual equipment specs, soil conditions and your course references.

Duration, man-days and unit labor cost from a crew's daily output.

RoleNo.Wage/day โ‚ฑ

Enter each crew member's working time per cycle (min). The cycle is paced by the busiest member; idle time and balance efficiency follow.

Member / stationWork time/cycle (min)

Crew results