Heavy Equipment Productivity Calculator
Pick a machine, enter its cycle and capacity, and get the hourly production โ with the worked formula, secondary outputs (capacity to match a loader, operation time, area/hour), a volume-basis note (BCM / LCM / CCM with swell), and a cycle-time chart.
โ Choose the machine
Hydraulic excavator / shovel. Production Q = (3600/Cm)ยทqยทKยทE in loose mยณ (LCM) per hour.
Wheel loader. Q = (3600/Cm)ยทqยทKยทE (LCM/h). Cm = load + travel + dump + return; enter it directly or build it below.
Dozing. Q = (60ยทqยทE)/Cm (LCM/h). Enter the blade load q directly, or compute it from blade size q = LยทHยฒยทa. Cm (min) = D/F + D/R + t_fixed.
Scraper. Q = (60ยทqยทE)/Cm (LCM/h). Cm (min) = load + haul + dump + return + turn. Build the haul/return from distance รท speed, or enter Cm directly.
Hauling. Q = (60ยทqยทE)/Cm (mยณ/h). Cm (min) = load + haul + dump + return + spot + wait. Also sizes a truck fleet to match a loader: N = โCm / T_loadโ.
Grading. Area rate A = (Vยท1000ยทL_eยทE)/N (mยฒ/h); operation time T = (NยทD)/(VยทE) (h) for a road length D.
Compaction. Compacted production P = (WยทSยท1000ยทLยทE)/N (CCM/h); area rate = (WยทSยท1000ยทE)/N (mยฒ/h).
๐ Typical values (editable) โ cycle times, fill & load factors, efficiency, speeds, passes
Load factor LF = 1/(1 + swell). BCM (bank) = LCM (loose) ร LF. CCM (compacted) depends on the soil's shrinkage and is what the compactor output reports directly.
๐ Production result
Worked solution
Sign in to your Ebora account
Sign in to use the Heavy Equipment Productivity Calculator and see your Ebora Points balance.
Top up Ebora Points
1 EP = โฑ1 ยท Minimum top-up 50 EP ยท Pay via GCash / Maya / Bank QRPh